Istana Ramps at Jalan Duta

Project Description

Client: Ahmad Zaki Sdn Bhd
Location: Kuala Lumpur
Services: Structure Design
Completion Date: 2011
Project Value: MYR 106 Million

Ramps connecting the new Istana at Jalan Duta. The 3 tier interchange consists of 4 directional ramps connecting the new Istana to Jalan Duta, one of the busiest roads in Kuala Lumpur. The superstructure consists of 2.5m deep continuous precast segmental PSC single cell box girder to be constructed using balance cantilever construction method. The foundation consisted of groups of large diameter bored piles and is connected by rigid pile cap at the top.

MMSB Consult was engaged as the Engineering Consultant to provide the detailed design, preparation of construction drawings, bill of quantities and specification for bridge structures.

Salient Features:

  • 3 tier interchange
  • 4 directional ramps on one of the busiest road Jalan Duta in Kuala Lumpur
  • 2.5m deep continuous precast segmental PSC single cell box girder for all 4 ramps
  • Balance cantilever construction method for box girders
  • Large diameter bored piles for foundation.