MMSB Consult was appointed as the infrastructure detailed design Consultant for the Western Corridor of the LRT 3 project, consisting of 12 stations, 1 depot and 2 bus depots over a 18.4 kilometre stretch. This project involves the use of U-troughs in the design, which is a pioneer technology in Malaysia.

MMSB Consult Civil & Structural works encompasses the following :

  • Earthworks
  • Road & Drainage
  • Sewerage Reticulation
  • Water Reticulation

MMSB’s scope includes Planning, Design Management, Construction, and Testing and Commissioning:

Planning Stage

  • Preparation of concept design
  • Interfacing with systems
  • Project Risk Management Plan
  • Authorities- Schedule for submission and approval
  • Incorporation of green technology in the station building design
  • Constructability and  Conceptual Traffic Management plans
  • Advance works planning and design

Design & Tender Stage

  • Guideway/Depot alignment
  • Guideway structures
  • Stations/Ancillary Buildings/ Multi- Level Car parks and bus depot
  • Depot - Train
  • At-grade – Roads and Drains
  • Building Architecture including landscaping and town planning
  • Prepare and manage Combined Service Drawings and SEM (Structural, Mechanical & Electrical) drawings
  • BIM Implementation post tender to LOD300/350
  • Clash analysis
  • Preparing Bill of Quantities, tender drawings and Specifications, milestones and key dates
  • Preparing detailed technical evaluation criteria

Construction

  • Review and verify WPC’s documentation
  • Issuance of Construction Drawings
  • Specifications
  • Safety, Health and Environmental plans
  • Project Quality Plans
  • Risk Management Plans
  • Site Supervision