Don Sahong Hydropower Project

Project Description

Client: Mega First Corporation Bhd
Location: Laos
Services: Civil & Structural
Completion Date: 2019
Project Value: RM 20 million

MMSB Consult was appointed as Consultant Engineer to carry out Detailed Engineering Design services for Civil and Structural Works.

The Proposed works involves widening and upgrading of existing and new road including beam slab bridge of length 350m leading to new Project site.

MMSB’s scope of works includes:

  • Overall design review.
  • Fast track Detailed Engineering Design
  • Issuance of Construction Drawing.

Various detail design works carried out by MMSB includes:

  • Geometrical design modifications where necessary.
  • Detailed Design of Access Bridge over river.
  • Retaining wall design at either end of bridge.
  • Preparation of detailed road signage and road marking drawings.